Sandon Point Stage 5

Client:  Stockland Developments

Contract Value:  $2.0M

Scope:

Stockland contracted Menai Civil to provide earthworks and civil infrastructure to the last stage of their Sandon Point Development.  The stage was 15 lots, and included:

  •  Remediation of uncontrolled fill to a depth of up to 8m
  • Integrated retaining wall/sound wall along the rail corridor
  • Roadworks and Drainage
  • Water, sewer, electrical and NBN

TOP